I spent 240 hours in Monolith Construction as a trainee in one of their projects – 
“The Pearl Place”.
The Pearl Place is a twin tower condominium building. Monolith was privileged to construct the podium area (6 floors) and tower 1.
Tower 2 is still in bidding.





My OJT Experience! :D


Estimate


Using a Total Station for layout of formworks



Overnight for Precast installation with picnic!:D 


Footing of elevator shaft
(from excavation to pouring)

Pouring of Stair


Skid loader and soil compactor experience.. :D


Flying objects


With other trainees and the Bosses


Our Lunch break siesta :D
(lunch break)


Owling like a BOSS!

BEFORE



AFTER