Saturday, June 30, 2012

FIRST OVERNIGHT


June 25-26, 2012
@ Calvin & Alvin's Crib
Adelina Street, Sampaloc Manila (P. Noval Side)

TEDIIIII! Y U MISSING IN ACTION?

@ Alvin & Calvin's room

PANCIT CANTON! :")



Friday, June 29, 2012

First Checking of Design Works


Steel Laboratory
June 27, 2012 - Wednesday
6:00 - 7:00 PM






CALVIN GERONA - OJT Experience




I spent 240 hours in Monolith Construction as a trainee in one of their projects – 
“The Pearl Place”.
The Pearl Place is a twin tower condominium building. Monolith was privileged to construct the podium area (6 floors) and tower 1.
Tower 2 is still in bidding.





My OJT Experience! :D


Estimate


Using a Total Station for layout of formworks



Overnight for Precast installation with picnic!:D 


Footing of elevator shaft
(from excavation to pouring)

Pouring of Stair


Skid loader and soil compactor experience.. :D


Flying objects


With other trainees and the Bosses


Our Lunch break siesta :D
(lunch break)


Owling like a BOSS!

BEFORE



AFTER




MAGZ DIZON - OJT Experience



My OJT experience is composed of two parts. I tried to apply to two (2) different companies so I can have two (2) different experiences.

PART I


Department of Public Works and Highways (DPWH)
The first company I attended was the Department of Public Works and Highways (DPWH).

I was assigned at the Bureau of Construction (BOC) under Sir Walter R. Ocampo. I started right away after the classes ended last March 2012. 


March 26, 2012 - First Day


April 11, 2012 - DPWH Sportsfest


DPWH Sportsfest Opening 2012

With Undersecretary Raul C. Asis
Aica and Carlo
(Intern form Nueva Ecija) 
All the other days were just ordinary days. We were stuck at the office for 8 hours, everyday. All we did were paperworks and Autocad. 


What I read on my first day at DPWH

 
Finished all these costings for almost a week!

I finished my first 120 hours on May 7, 2012.
But I didn't want to be stucked at the office while all my other batchmates are enjoying their first opportunity to see and experience what is really on the outside world. What to really know about our course and what we will do in the near future after we graduate and become real engineers. So, I looked for another another company to work with and complete the second half of the required time needed.



PART II

Design Coordinates, Inc. (DCI)

The second company I worked with was the Design Coordinates, Inc. (DCI) . According to what I know, DCI...
        - Is the leading domestic company in the Construction Project
         Management field. 
        - A founding member of the Construction Project Management Association
         of the Philippines (CPMAP).
       - And it is one of the few companies specializing in Construction Project
         Management only. 


Their on-going project that I chose to attend with is the Project Solaire Manila. It is the biggest on-going project as of today here in the Philippines.


Solaire Manila

SOLAIRE MANILA
(Paranaque City)
Integrated Entertainment Resort Complex


  • Located within the Bagong Nayong Pilipino Complex, ParaƱaque City, the Solaire Manila project is a world class integrated resort complex which includes a five-star, 500-room hotel covering some 165,000 square meters of floor area.
  • The Entertainment City project features an integrated resort facility including a five-star, 500-room hotel covering an area of 8.3 hectares. It will also feature a state of the art meeting and convention and ballroom venues, restaurants as well as health and wellness facilities.
  • The complex will also feature state of the art meeting and convention facilities as well as relaxation and leisure facilities such as a live performance theater, an array of restaurants, health and wellness facilities.
  • Phase I of the Project is a 14 storey building complex with an 11 storey hotel on top of a 3 level podium, and a 10 storey parking building with an 11th floor for machines and equipment. 
  • The Phase I hotel, restaurants, retail, recreation and back-of-house facilities will occupy approximately 73,484 sq. meters.
  • The casino and gaming area will occupy approximately 22,268 sq. meters. 
  • It will have 27,700 sq.m. of gaming area that will hold 1,200 slot machines and 300 gaming tables. It will also have 500 hotel rooms and food and beverage outlets, including a 240-seat Chinese restaurant, 149-seat American steakhouse, 146-seat Japanese restaurant, 120-seat Italian restaurant, 250-seat international buffet/coffee shop, 176-seat noodle shop, and 216-seat food court and 66-seat lobby bar.
  • Ample parking is provided through the 10-storey, 3,000 slots, parking building. 
  • It will also have a 1,000-seat grand ballroom, spa and fitness center, and bayview promenade.


May 12, 2012 (Saturday)


My first day at Solaire
Wasn't able to visit the site on my first day because I don't have my PPEs (Personal Protective Equipments) yet.


May 14, 2012 (Monday)

                I was formally introduced to the bosses. And vice versa. They gave me a very
       warm welcome being a part of the team now. Though I got very nervous 'cause they
       looked very intimidating. :) 


Finally got my PPEs!
Safety Shoes, Hard Hat with DCI's logo and Vest (wasn't able to take a picture)
ALL FOR FREE!! :)

My very first site experience! :)
With OJT-mates: Aica, Carrelle, Edmond & Guy (He took this photo :p)

May 22, 2012 (Tuesday)

                I was the only intern that was present that day so I got the privileged to attend
         an official meeting which is usually happening every Tuesdays regarding the weekly
         progress report about the site. I was able to experience what was happening during
         the meeting and what are the matters they're talking about. Some representatives
         of the Owner/Developer, Architects, Project Management team (That's us), and
         other Sub-contractors were there. 
                I also got a free Mcdo lunch that day 'cause I was present at the meeting :)
         Teehee!

May 31, 2012

                Aica and I were the very lucky interns that was given the chance to see the
          showroom of the hotel rooms at Eco Plaza, Makati City.
                Free lunch at Persia Grill c/o one of the Sub-contractors :) :D

We were trying out the beds :D 

Site Pictures:

Pouring of Chemical Floor Hardener

Pile Driving Works

Installation of Bituminous Membrane Waterproofing

Alley Macks!
It has always been my dream to ride this thing.
*wishgranted*

Cooling Tower at the top most level of the Garage - Level 11

Before and after of this amazing spiral stair.
FYI, it carries its own load.

Helipad
Located at the top of the hotel.

Warehouse Construction

Solaire Manila, in different views:

Hotel
(Front Elevation)

Garage
(Front Elevation)

Solaire Manila
(Front Elevation)

Solaire Manila
(Man's Eye View?)

Solaire Manila
(Back Elevation)

With workmates & bosses:

Pang Lookbook? :)

Workplace!
DCI's office.

Sam and Marian's last day of internship
(Interns from PLM)

Goofing around during work hours
With one of our boss, Sir Fernando Jose. Haha!

The big boss!
Project Manager: Sir Gail Manalastas

Intern-mates with Sir Gail & Sir Robie :)